Repairs on the Parthenon Towers • Nashville, TN

 

Completed Project:

In the Spring of 2012 there was a power failure and explosion of the electrical power main feeder bus ducts at the Parthenon Towers. Amprite's first response was restoring temporary power. Sixteen generators were provided on location and temporary cables were run throughout the building. Residences were able to return to their apartments just two days after the explosion.

 

In two weeks, the second phase began with Nashville Electric Service (NES) providing temporary service. Amprite ordered three distribution panels that were connected to the temporary electrical service.

 

In the final phase, it was determined that the main bus duct power feed needed to be replaced and installed up through the fifteen floors of the apartment building.

 

 